| Type of Item | MAIN BOILER STEAM LINES |
| Final destination | Italy |
| Year of production | 2013 |
| Project | REVAMPING OF BOILER MAIN STEAM LINES |
| Scope of Supply | DESIGN, SUPPLY, WELDING, TESTING, START UP OF BOILER LINES |
| Note | Design, site assembly, welding, and testing of the new elbow of the main boiler steam lines. Material A335 P22. O.D. 609,6 mm thk. 42 mm. |