Power SUBSTITUTION OF MAIN BOILER LINES Back
Type of Item SUBSTITUTION OF MAIN BOILER LINES
Client ENEL SPA
End User ENEL SPA
Year of production 2011
Project REVAMPING OF BOILER MAIN STEAM LINES - GENOVA PLANT
Scope of supply DESIGN, SUPPLY, WELDING, TESTING, START UP OF BOILER LINES
Note

Design, site assembly, welding, and testing of the new elbow of the main boiler steam lines. 

Material A335 P22

O.D. 609,6 mm thk. 42 mm