TELEHEATING SYSTEM

Type of Item TELEHEATING SYSTEM Final destination Italy Year of production 2013-2014 Project TELEHEATING SYSTEM AND NETWORK Scope of Supply SUPPLY AND INSTALLATION OF COMPLETE TELEHEATING SYSTEM AND NETWORK Note Complete mechanical installation of Boilers, Pump Station and Cogeneration Motor.Design, manufacturing and installation of Smokes Heat recovery and exhaust line.

SUBSTITUTION OF SUPERCRITICAL BOILER LINES

Type of Item SUBSTITUTION OF SUPERCRITICAL BOILER LINES Final destination Italy Year of production 2013 Project BOILER SUBSTITUTION PLANT Scope of Supply DESIGN, SUPPLY, WELDING, TESTING, START UP OF PLANT Note Design, site assembly, welding, and testing of the piping and components for the new attemperation lines. Supply, prefabrication and installation of new superheated and reheated […]

MAIN BOILER STEAM LINES

Type of Item MAIN BOILER STEAM LINES Final destination Italy Year of production 2013 Project REVAMPING OF BOILER MAIN STEAM LINES Scope of Supply DESIGN, SUPPLY, WELDING, TESTING, START UP OF BOILER LINES Note Design, site assembly, welding, and testing of the new elbow of the main boiler steam lines. Material A335 P22.O.D. 609,6 mm thk. 42 […]

POWER PLANT DUST SUPPRESSION SYSTEM

Type of Item POWER PLANT DUST SUPPRESSION SYSTEM Final destination Italy Year of production 2013 Project NEW PLANT FOR DUST SUPPRESSION Scope of Supply DESIGN, SITE ASSEMBLY, TESTING AND START UP OF ELECTRICAL & CONTROL SYSTEM Note Design, site assembly, start-up and testing of the electrics and automation plants for dust suppression.

FEEDING BY DISTRICT HEATING

Type of Item FEEDING BY DISTRICT HEATING Final destination Italy Year of production 2013 Project REVAMPING OF ROOF HEATING SYSTEM Scope of Supply ROOF HEATING SYSTEM “TERMOSTRISCE” Note Design, supply and installation of feeding by district heating

THERMO-ELECTRIC PLANT

Type of Item THERMO-ELECTRIC PLANT Final destination Italy Year of production 2012 Project FLEXIBILITY GVR Scope of Supply DESIGN, SUPPLY, WELDING, TESTING, START UP OF PLANT Note Design, site assembly, welding, start-up and testing of the piping and components for the new project. Optimization of the boilers starting time.Material: A335 P22, O.D. 762 mm thk. 50 […]